คำถามที่พบบ่อย
FAQ
A: During the day, it generates electricity from the sun. which customers can use the electricity generated by the Solar Roof to power a variety of electrical appliances Customers who use their homes during the day can reduce their electricity purchases as soon as a Solar Roof is installed. Customers can see the reduced electricity usage right away on their lower monthly bill. Customers will be able to easily see the consequences of their electricity savings on their monthly bill, which will indicate how much electricity they used in the previous six months as well as how much they used in the current month.
In some cases, the installation of the solar roof may not be completed in line with the electricity billing cycle, causing the electricity bill for the first month that the customer receives after the installation to not be displayed or to show unclear energy savings results. Therefore, customers should It is important to consider the electricity bill in the second billing cycle after the installation of the solar roof is complete.
In some cases, the installation of the solar roof may not be completed in line with the electricity billing cycle, causing the electricity bill for the first month that the customer receives after the installation to not be displayed or to show unclear energy savings results. Therefore, customers should It is important to consider the electricity bill in the second billing cycle after the installation of the solar roof is complete.
A : In the daytime when sunlight hits the solar panel. The solar panel produces direct current (DC) and sends the generated direct current to the inverter to convert it to alternating current. to be alternating current (AC) to supply electricity to the home electrical control cabinet (MDB) and to mix with the electricity of the Electricity Authority, then it will flow to various electrical appliances. As soon as the system is turned on, it automatically helps to reduce the purchase of electricity. (Installation is complete.)
A : 3 Packages.
Remark:
-Calculation of the minimum amount of electricity produced per year
-Using the assumption of maximum sunlight intensity at 4 hours per day and preliminary calculating 4.4 baht per unit.
-Products in the three packages listed above. It is a Tier 1 solar panel with an inverter from Huawei.
-The company reserves the right to change this information without prior notice.
-Such information in this document is just an estimate, not a guarantee the amount of electricity produced.
-Solar panel operation may differ depending on environmental factors such as climate, angle degree, being obscured, installation area, and so on.
Remark:
-Calculation of the minimum amount of electricity produced per year
-Using the assumption of maximum sunlight intensity at 4 hours per day and preliminary calculating 4.4 baht per unit.
-Products in the three packages listed above. It is a Tier 1 solar panel with an inverter from Huawei.
-The company reserves the right to change this information without prior notice.
-Such information in this document is just an estimate, not a guarantee the amount of electricity produced.
-Solar panel operation may differ depending on environmental factors such as climate, angle degree, being obscured, installation area, and so on.
A:
-Solar Panel
-Inverter
-Mounting
-DC Fuses Box and AC Surge is used to prevent short circuits and to turn off the solar roof's operation.
-Electrical cables and conduit run the system from the solar panels to the inverter and run the system from the power converter to the electrical control cabinet in the customer's house.
-Grounding system for lightning protection
-Solar Panel
-Inverter
-Mounting
-DC Fuses Box and AC Surge is used to prevent short circuits and to turn off the solar roof's operation.
-Electrical cables and conduit run the system from the solar panels to the inverter and run the system from the power converter to the electrical control cabinet in the customer's house.
-Grounding system for lightning protection
A: Solar panel prices in Thailand today, Referring to world market prices which has already dropped a lot in the past 4–5 years, with the current price of solar panels having been relatively stable for about 2 years (due to the COVID situation). There may be some price increases according to market forces. The company therefore expects that the panel price is unlikely to be significantly reduced.
A:
1. Solar panels have a 10-year warranty from the manufacturer and a 25-year warranty on power generation efficiency, but have a lifespan of 40-50 years.
2. The power inverter has a 5-year warranty from the manufacturer.
3. The installation part has a 2-year warranty.
1. Solar panels have a 10-year warranty from the manufacturer and a 25-year warranty on power generation efficiency, but have a lifespan of 40-50 years.
2. The power inverter has a 5-year warranty from the manufacturer.
3. The installation part has a 2-year warranty.
A: 1 solar panel (approximately 2.00 square meters in size) weighs approximately 20 kilograms per panel, but when combined with the weight of the support structure of the installation, the weight is 20–25 kilograms per square meter.
A: It is not recommended to install a roof with a steeper angle than 60 degrees due to roof angle limitations.
A: Can be installed on any roof except for galvanized roofs and Roman tiles that are over 10 years old.
A: Can't be installed normally.
A: Installation of a solar roof on the roof of one set takes about 3–5 days, with the following steps:
- Transport the equipment to the installation site to install the solar panel mounting bracket on the roof. by attaching the panel support frame to the roof structure without drilling the roof tiles (for CPAC tile roofs and flat tiles). If it is another type of roof, it will have to be considered at the next job site. It will try to avoid drilling into the roof unless necessary.
- Install the solar panel on the panel mounting bracket by a gripping device
- Install a power converter (inverter) and link it to the electrical control cabinet (MDB) inside the house.
- Installed a Sunny Portal processing system for measuring the amount of electricity produced through the Internet.
- Check the job and deliver it to the customer.
- Transport the equipment to the installation site to install the solar panel mounting bracket on the roof. by attaching the panel support frame to the roof structure without drilling the roof tiles (for CPAC tile roofs and flat tiles). If it is another type of roof, it will have to be considered at the next job site. It will try to avoid drilling into the roof unless necessary.
- Install the solar panel on the panel mounting bracket by a gripping device
- Install a power converter (inverter) and link it to the electrical control cabinet (MDB) inside the house.
- Installed a Sunny Portal processing system for measuring the amount of electricity produced through the Internet.
- Check the job and deliver it to the customer.
A: Installation of a solar roof does not cause leakage because there is no roof penetration (for CPAC tile roofs and flat tiles). If it is another type of roof, it will have to be considered at the next job site, will try to avoid penetration of the roof unless necessary. However, if the original roof already leaks, the customer must fix it before installing.
A: Can be installed in any direction. But the best direction is South.
A: Normally, rainwater and the slope of the installation will cause various amounts of dust, has already been washed naturally. However, if the customer wants, the panel can be cleaned by itself by simply spraying water into a mist, like rain, but should not be sprayed during the day. And should spray water only on the safety glass area, avoiding spraying water under the solar panel.
A: Produced energy (See energy value from Inverter) will be reduced compared to days with the same weather conditions.
The panel was broken by a solid impact with cracks.
The panel was broken by a solid impact with cracks.
A : for turntable meter It is possible for the meter to reverse. for digital meter The meter will not turn back, however, when performing a request for size with the utility. (According to the Electricity Authority's regulations) is completed, the electricity utilities will change the meter to a digital meter. causing the meter to not turn back
A: Solar Roof products have a 2-year installation warranty, which will be sent by a team to inspect the system every 6 months, totaling 4 times throughout the installation warranty period. Solar Roof system is a system that almost does not require maintenance. special treatment, because the solar panel has a long service life and is self-cleaning. Because the rain water will naturally wash away dust and dirt.